In this guide — 8 steps
Included parts
Wooden dowels
Plastic dowels
Fixed shelf studs
Euro screws
Soft-close drawer runners
Drilled side panels
Fixed shelves
Back support panel
Tools you’ll need
Impact driver
Drill and 5mm drill bit
Screwdriver
Pencil
Set square
Please note
The wardrobe shown in this guide is an example. Your project may differ.
We supply the screws required to assemble the wardrobe tower. Installation screws are not supplied because the appropriate fixings depend on your wall construction.
L-brackets, support brackets and wall fixings are not supplied as standard. These can be ordered separately if required.
-
Insert the dowels
Push the plastic and wooden dowels into the designated holes at the top of both side panels.
Install the wooden dowels in the first hole closest to the top edge of each panel.
-
Mark the shelf and runner positions
Lay the soft-close drawer runners on the side panels to check their positions. Do not screw them into place yet.
Use the following layout:
- Fit the bottom fixed shelf studs into the lowest holes.
- Leave one empty hole above the bottom fixed shelf studs.
- Position the first runner above the empty hole.
- Leave five visible holes between each runner.
- Position the next runner over the sixth and seventh holes.
- Above the top runner, fit the top fixed shelf studs into the fifth hole up.
Use a pencil and set square to mark the second fixing point for each runner.
Important: Do not install the runners yet. The fixed shelves must be installed before the runners are secured.
-
Drill the pilot holes
Drill a 5mm pilot hole at each marked second fixing point.
Drill each hole to a maximum depth of 12mm. Take care not to drill through the side panel.
Tip: Place tape around the drill bit at 12mm to use as a depth guide.
-
Fit the shelves and support panel
Slide the fixed shelves onto the studs and tighten the cams with a screwdriver.
Position the back support panel onto the dowels at the top of the tower, then tighten its cam.
Note: Make sure the cam on the back support panel faces the back of the tower so it won’t be visible after installation.
-
Fit the second side panel
Position the second drilled side panel onto the fixed shelves and back support panel.
Once aligned, tighten the cams to secure the panel.
Check: Before fitting the panel, make sure it has matching fixed shelf studs and pilot holes.
-
Secure the drawer runners
Once the fixed shelves are installed, position the soft-close runners back onto the side panels.
Secure each runner with two Euro screws, using the pilot holes drilled earlier for the second fixing points.
-
Secure the tower to the wall
Ask another person to help stand the wardrobe tower upright and move it into position.
Check that the tower is correctly positioned, then secure it to the wall using appropriate fixings.
Safety: Secure the tower to the wall before inserting the drawers. Wall fixings are not supplied because the correct fixing method depends on your wall construction.
-
Insert the drawers
Position the assembled soft-close drawers onto the runners.
Make sure each drawer connects correctly with both runners before pushing it fully into place.
If your drawers haven’t been assembled yet, follow the soft-close drawer assembly guide .