Please see the video above for a demonstration.
You will need
- Plastic and wooden dowels
- Shelf supports
- Euro screws
- Fixed shelf studs
- Drill and 5mm drill bit
- Philips screwdriver
- Impact driver and #2 Square bit OR #2 square head screwdriver
Tower Assembly
NOTE: The spacing and position of your fixed shelves and drawer runners will depend on your desired tower layout.
Step 1
Lay the drilled side panel on the floor.
Fit the wooden and pushfit dowels.
Step 2
Position your first runner at the bottom of the side panel, leaving 5 visible holes for the fixed shelf and bottom of the drawer.
If you have a tower with drawers, the fixed shelf goes below the bottom drawer.
Step 3
Decide where you want the drawers and fix the drawer runners with the euro screws.
Note: you will need to leave 7 visible holes between each runner, or if you are using drawers with handles you will need to leave 6 visible holes.
Step 4
Install fixed shelf studs above top drawer and below bottom drawer.
Step 5
Fit the back support panel to the top of the tower and tighten cam to secure.
Step 6
Install the fixed shelves and tighten cams to secure.
Step 7
Place side panel on top of structure and tighten back support panel and fixed shelf cams.
Step 8
Flip the tower onto it’s back and then lift and walk to an upright position.
Step 9
Secure the tower to the wall using your required fixings then complete the rest of the installation by fitting the top panel, side panels and hanging rails.